| 402071995 | Form 17 | 6/3/2019 | 6/12/2019 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 91 | 92 | No | -- | -- | Surface casing produced no fluid. Well shut in for 15min ended with no psi. Tubing shut in. |
| 401995751 | Form 17 | 3/27/2019 | 4/4/2019 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 98 | 98 | No | -- | -- | Surface casing produced no fluid. Well shut in for 15min ended with no psi. Tubing shut in. |
| 401906594 | Form 17 | 1/10/2019 | 1/16/2019 | | 1 | WHISPER | -- | 0 | DOWN TO 0 | 78 | 78 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS. SHUT IN 15 MIN ENDED WITH 0 PSI. WELL AND MASTER SHUT IN. |
| 401836448 | Form 17 | 11/8/2018 | 11/12/2018 | | 1 | WHISPER | -- | 0 | DOWN TO 0 | 80 | 80 | No | -- | -- | Surface casing produced no fluids. Surface casing shut in for 15 min ended with 0 PSI. Well and master shut in. |
| 401019881 | Form 17 | 3/9/2016 | 4/1/2016 | | 1 | GAS | -- | 0 | DOWN TO 0 | 80 | 77 | No | -- | -- | SC DID NOT PRODUCE ANY FLUID. 15 MIN BUILD UP, DEAD. |
| 400878426 | Form 17 | 7/6/2015 | 8/20/2015 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 0 | 0 | No | -- | -- | POST REMEDIATION TEST. SURFACE CASING DID NOT PRODUCE ANY FLUID. 15 MIN. BUILD-UP, DEAD. INITIAL POST REMEDIATION BLOW DOWN ON 6/25/2015 STARTED WITH A WHISPER AND BLEW DOWN TO 0 PSI. |
| 400155610 | Form 17 | 7/19/2010 | 4/14/2011 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 505 | 506 | No | -- | -- | No pressure no build up |
| 400155389 | Form 17 | 7/19/2010 | 4/14/2011 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 505 | 506 | No | -- | -- | No pressure no build up |
| 400143431 | Form 17 | 7/19/2010 | 3/9/2011 | PLUNGER LIFT | 0 | DOWN TO 0 | -- | 0 | DOWN TO 0 | 505 | 506 | No | -- | -- | No pressure, no build up |