| 403556665 | Form 17 | 10/9/2023 | 10/11/2023 | SHUT-IN | 26 | CONTINUOUS | GAS | 0 | NO FLOW | 0 | 0 | Yes | -- | -- | Pre-P&A. 26 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. |
| 403313929 | Form 17 | 2/6/2023 | 2/7/2023 | SHUT-IN | 24 | DOWN TO 0 | GAS | 0 | DOWN TO 0 | 420 | 420 | No | -- | -- | Annual Test. 24 PSI blew down to 0 PSI within first few seconds of test. Intermittent waster for duration of test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 4/20/2022 | 5/9/2022 | | 24 | Down to Zero | -- | 0 | Down to Zero | 400 | 400 | No | No | No | |
| Click for Specifics | Full | 4/19/2021 | 11/1/2021 | | 21 | Down to Zero | -- | 0 | No Flow | 400 | 400 | No | None | None | |
| 402566038 | Form 17 | 12/31/2020 | 1/5/2021 | SHUT-IN | 6 | DOWN TO 0 | -- | 0 | NO FLOW | 390 | 390 | No | -- | -- | Abatement system follow up test, 6 PSI blew down to 0 instantly no pressure or flow for the remainder of the 30 min test |
| 402443816 | Form 17 | 4/29/2020 | 7/15/2020 | | 30 | GAS | -- | 0 | WHISPER | 480 | 480 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402080938 | Form 17 | 4/16/2019 | 6/19/2019 | PLUNGER LIFT | 29 | DOWN TO 0 | -- | 0 | NO FLOW | 500 | 500 | No | -- | -- | Annual Test 29 PSI whisper blew down to 0 PSI after 30 min. PDC will attempt to collect a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |