| 403512223 | Form 17 | 8/25/2023 | 8/28/2023 | SHUT-IN | 42 | CONTINUOUS | GAS AND LIQUID HYDROCARBON | 23 | CONTINUOUS | 1200 | 1200 | Yes | -- | -- | Pre-P&A. 42 PSI continuous gas and oil flow blew down to 23 PSI within thirty minutes, ~20 gallons. PDC will schedule a sampling event and submit results via form 43. |
| Click for Specifics | Full | 9/28/2022 | 10/10/2022 | | 44 | Down to Zero | -- | 0 | Down to Zero | 1140 | 1140 | No | None | None | |
| Click for Specifics | Full | 10/6/2021 | 11/1/2021 | | 38 | Water H2O | -- | 0 | No Flow | 1100 | 1100 | No | None | None | |
| 402615585 | Form 17 | 11/27/2020 | 3/3/2021 | | 30 | DOWN TO 0 | GAS | 0 | NO FLOW | 1050 | 1050 | No | -- | -- | Abatement system follow up test, 30 PSI blew down to 0 PSI within first min of test. No pressure or flow observed for the remainder of test. PDC will continue to monitor and re-test in 6 months. PDC will submit a sundry with well plans and flow rate information as soon as possible. |
| 402474523 | Form 17 | 7/9/2020 | 8/25/2020 | SHUT-IN | 20 | GAS | -- | 0 | NO FLOW | 1150 | 1200 | No | -- | -- | Annual test, 20 PSI blew down to 0 PSi within forst minute of test. no pressure or flow observed for the remainder of the test |
| 402242270 | Form 17 | 11/6/2019 | 11/18/2019 | PLUNGER LIFT | 42 | CONTINUOUS | -- | 40 | CONTINUOUS | 950 | 950 | No | -- | -- | Annual bradenhead testing. Well flowed liquid when bradenhead opened. Bradenhead will be sampled and results to be uploaded into EDD when available. |
| 1796810 | Form 17 | 5/7/1994 | 8/26/2009 | FLOWING | -- | | -- | -- | DOWN TO 0 | -- | -- | No | -- | -- | |