| 403900736 | Form 17 | 8/23/2024 | 8/26/2024 | | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| Click for Specifics | Full | 4/17/2024 | 4/30/2024 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | |
| Click for Specifics | Full | 6/28/2023 | 7/3/2023 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 11/16/2022 | 11/29/2022 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | None | None | |
| 402746373 | Form 17 | 7/9/2021 | 7/13/2021 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 65 | 65 | No | -- | -- | Test per NTO. Vacuum on open for 5 seconds. |
| 402527216 | Form 17 | 11/3/2020 | 11/6/2020 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 50 | 50 | No | -- | -- | Test per 2020 NTO. BH dead. |
| 402263164 | Form 17 | 12/13/2019 | 12/14/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 80 | 80 | No | -- | -- | |