| 2606053 | Form 17 | 1/18/2010 | 4/1/2010 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 300 | 300 | No | -- | -- | Burived valve was uncovered, opened and verified open. Safety stop installed. Valve was piped up above ground level and gauge installed. No flow observed during test, no fluid observed. Piping arrangement was wrapped and made permanent with gauge installed. Bradenhead test is successful - no further action required. |