401639093 | Form 17 | 5/7/2018 | 5/14/2018 | PLUNGER LIFT | 1 | WHISPER | -- | 0 | DOWN TO 0 | 796 | 796 | No | -- | -- | Surface casing produced no fluids. Surface casing shut in for 15 minutes ended with a whisper. Well and master shut in. |
401032316 | Form 17 | 4/1/2016 | 4/20/2016 | | 1 | GAS | -- | 0 | DOWN TO 0 | 788 | 788 | No | -- | -- | SC DID NOT PRODUCE ANY FLUID. 15 MIN BUILD UP, WHISPER. DEMCO WAS CLOSE UPON ARRIVAL. |
400434768 | Form 17 | 5/15/2013 | 6/17/2013 | PLUNGER LIFT | 16 | GAS | -- | 0 | DOWN TO 0 | 526 | 527 | No | -- | -- | Surface casing produced no fluids during the form 17 test. |