| Click for Specifics | Full | 3/4/2026 | 3/9/2026 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Light | 2/26/2025 | 3/4/2025 | | 0 | | -- | 0 | | 0 | 0 | No | No | No | |
| Click for Specifics | Full | 3/15/2024 | 4/1/2024 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/29/2023 | 4/10/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 0 | 0 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 9/29/2022 | 10/10/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 0 | 0 | No | None | None | |
| 402679083 | Form 17 | 4/28/2021 | 5/4/2021 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | -- | -- | No | -- | -- | Test per NTO. BH dead. |
| 402520561 | Form 17 | 10/20/2020 | 10/28/2020 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | -- | -- | No | -- | -- | Test per 2020 NTO. BH dead. |
| 402223656 | Form 17 | 10/25/2019 | 10/28/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 10 | 10 | No | -- | -- | Test per NTO. BH dead |