| 404485064 | Form 17 | 12/23/2025 | 12/23/2025 | SHUT-IN | 204 | DOWN TO 0 | GAS | 0 | NO FLOW | 1100 | 1100 | No | -- | -- | BH before P&A |
| Click for Specifics | Full | 8/13/2025 | 8/19/2025 | | 195 | Continuous Flow | -- | 0 | No Flow | 200 | 200 | No | No | No | |
| 404149570 | Form 17 | 3/27/2025 | 4/1/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial BH Test. |
| 404123365 | Form 17 | 3/13/2025 | 3/25/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | This bradenhead test is being submitted to satisfy COA on sundry doc 404122749 ahead of casing repair operations.
0 Psi
0 Flow
0 Liquid |