| 404344681 | Form 17 | 9/3/2025 | 9/8/2025 | FLOWING | 1 | CONTINUOUS | GAS | 0 | NO FLOW | 1387 | 1387 | No | -- | -- | This Form 17 is being submitted to satisfy a COA attached to Doc# 404189355. |
| 404154820 | Form 17 | 4/4/2025 | 4/7/2025 | FLOWING | 1599 | CONTINUOUS | GAS | 0 | WHISPER | 2271 | 2268 | No | -- | -- | TEP has initiated a diagnostic evaluation due the bradenhead threshold pressure exceedance and the test results. The bradenhead test was performed through a two-inch valve. |
| Click for Specifics | Full | 10/24/2024 | 11/12/2024 | | 0 | N/A | -- | 0 | No Flow | 0 | 0 | No | No | No | 2" blowdown. No tubing |