| Click for Specifics | Full | 2/27/2025 | 3/11/2025 | | 273 | N/A | -- | 0 | No Flow | 284 | 292 | No | No | No | 2" blowdown |
| Click for Specifics | Full | 4/18/2024 | 5/13/2024 | | 252 | N/A | -- | 0 | Down to Zero | 284 | 298 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 10/6/2023 | 11/6/2023 | Shut-In | 0 | N/A | -- | 0 | No Flow | 516 | 517 | No | No | No | 1/2" blowdown. No tbg in well |
| 403452509 | Form 17 | 7/3/2023 | 7/3/2023 | CLOCK/INTERMITTER | 169 | CONTINUOUS | GAS | 109 | CONTINUOUS | 167 | -- | No | -- | -- | This annual bradenhead test was ended at ten minutes due to the tubing and production casing pressures trending with the bradenhead pressure. |
| Click for Specifics | Full | 7/5/2022 | 8/9/2022 | Plunger Lift | 1 | N/A | -- | 0 | No Flow | 339 | 339 | No | No | No | 1/2” blowdown |
| Click for Specifics | Full | 9/8/2021 | 10/11/2021 | Plunger Lift | 5 | N/A | -- | 0 | No Flow | 275 | 276 | No | No | No | |