| Click for Specifics | Full | 7/24/2025 | 9/1/2025 | | 189 | N/A | -- | 0 | No Flow | 446 | 447 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 4/23/2024 | 5/13/2024 | | 143 | N/A | -- | 0 | No Flow | 331 | 332 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 6/22/2023 | 7/17/2023 | Plunger Lift | 407 | N/A | -- | 0 | No Flow | 312 | 312 | No | No | No | 1/2" blowdown |
| 403141920 | Form 17 | 8/17/2022 | 8/19/2022 | CLOCK/INTERMITTER | 87 | NO FLOW | -- | 87 | NO FLOW | 87 | 87 | No | -- | -- | Per approval and guidance from the COGCC Area Engineer, a modified bradenhead test is being submitted to the COGCC due to pending remedial work on this well and safety concerns with performing a full bradenhead test at this time. TEP will perform a bradenhead test on the well after the proposed remedial work is complete and will submit the results to the COGCC via a Form 17. |
| Click for Specifics | Full | 9/16/2021 | 10/11/2021 | Plunger Lift | 183 | N/A | -- | 183 | Continuous | 183 | 183 | No | No | No | |