| Click for Specifics | Full | 2/27/2026 | 3/16/2026 | | 0 | N/A | -- | 0 | No Flow | 247 | 250 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 2/21/2025 | 3/11/2025 | | 0 | N/A | -- | 0 | No Flow | 265 | 267 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 4/11/2024 | 5/13/2024 | | 2 | N/A | -- | 0 | No Flow | 228 | 231 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 9/22/2023 | 10/9/2023 | Plunger Lift | 3 | N/A | -- | 0 | No Flow | 276 | 278 | No | No | No | 1/2" blowdown |
| 403197551 | Form 17 | 10/13/2022 | 10/14/2022 | SHUT-IN | 461 | NO FLOW | -- | 461 | NO FLOW | 461 | 461 | No | -- | -- | Per approval and guidance from the COGCC Area Engineer, a modified bradenhead test is being submitted to the COGCC due to pending remedial work on this well and safety concerns with performing a full bradenhead test at this time. TEP will perform a bradenhead test on the well after the proposed remedial work is complete and will submit the results to the COGCC via a Form 17. |
| Click for Specifics | Full | 8/24/2021 | 9/6/2021 | Plunger Lift | 230 | N/A | -- | 200 | Continuous | 420 | 240 | No | No | No | |