| Click for Specifics | Full | 2/27/2026 | 3/16/2026 | | 0 | N/A | -- | 0 | No Flow | 344 | 345 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 2/21/2025 | 3/11/2025 | | 0 | N/A | -- | 0 | No Flow | 345 | 347 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 4/11/2024 | 5/13/2024 | | 0 | N/A | -- | 0 | No Flow | 345 | 345 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 7/3/2023 | 8/14/2023 | Plunger Lift | 0 | N/A | -- | 0 | No Flow | 343 | 350 | No | No | No | 1/2" blowdown |
| 403197567 | Form 17 | 10/13/2022 | 10/14/2022 | SHUT-IN | 598 | NO FLOW | -- | 598 | NO FLOW | 598 | 598 | No | -- | -- | Per approval and guidance from the COGCC Area Engineer, a modified bradenhead test is being submitted to the COGCC due to pending remedial work on this well and safety concerns with performing a full bradenhead test at this time. TEP will perform a bradenhead test on the well after the proposed remedial work is complete and will submit the results to the COGCC via a Form 17. |
| Click for Specifics | Full | 8/24/2021 | 9/6/2021 | Plunger Lift | 0 | N/A | -- | 0 | Continuous | 350 | 250 | No | No | No | |