| Click for Specifics | Full | 2/27/2026 | 3/16/2026 | | 13 | N/A | -- | 0 | No Flow | 277 | 283 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 2/21/2025 | 3/11/2025 | | 6 | N/A | -- | 0 | No Flow | 282 | 293 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 4/11/2024 | 5/13/2024 | | 2 | N/A | -- | 0 | No Flow | 235 | 241 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 7/3/2023 | 8/14/2023 | Shut-In | 18 | N/A | -- | 0 | No Flow | 527 | 527 | No | No | No | 1/2" blowdown |
| 403197651 | Form 17 | 10/13/2022 | 10/14/2022 | CLOCK/INTERMITTER | 460 | NO FLOW | -- | 460 | NO FLOW | 461 | 461 | No | -- | -- | Per approval and guidance from the COGCC Area Engineer, a modified bradenhead test is being submitted to the COGCC due to pending remedial work on this well and safety concerns with performing a full bradenhead test at this time. TEP will perform a bradenhead test on the well after the proposed remedial work is complete and will submit the results to the COGCC via a Form 17. |
| Click for Specifics | Full | 8/24/2021 | 9/6/2021 | Plunger Lift | 0 | N/A | -- | 0 | Continuous | 310 | 310 | No | No | No | |