| Click for Specifics | Full | 2/27/2026 | 3/16/2026 | | 0 | N/A | -- | 0 | No Flow | 215 | 219 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 2/21/2025 | 3/11/2025 | | 27 | N/A | -- | 0 | No Flow | 290 | 292 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 4/11/2024 | 5/13/2024 | | 120 | N/A | -- | 0 | No Flow | 476 | 476 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 7/3/2023 | 8/14/2023 | Plunger Lift | 44 | N/A | -- | 0 | No Flow | 277 | 279 | No | No | No | 1/2" blowdown |
| 403197593 | Form 17 | 10/13/2022 | 10/14/2022 | SHUT-IN | 510 | NO FLOW | -- | 510 | NO FLOW | 321 | 321 | No | -- | -- | Per approval and guidance from the COGCC Area Engineer, a modified bradenhead test is being submitted to the COGCC due to pending remedial work on this well and safety concerns with performing a full bradenhead test at this time. TEP will perform a bradenhead test on the well after the proposed remedial work is complete and will submit the results to the COGCC via a Form 17. |
| Click for Specifics | Full | 8/24/2021 | 9/6/2021 | Plunger Lift | 0 | N/A | -- | 0 | Continuous | 300 | 300 | No | No | No | |