| Click for Specifics | Full | 1/21/2026 | 2/9/2026 | | 31 | N/A | -- | 0 | No Flow | 336 | 337 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 1/22/2025 | 2/10/2025 | | 35 | N/A | -- | 0 | No Flow | 271 | 276 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 1/19/2024 | 2/5/2024 | Shut-In | 0 | N/A | -- | 0 | No Flow | 496 | 496 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 6/22/2023 | 7/17/2023 | Plunger Lift | 1 | N/A | -- | 0 | No Flow | 277 | 279 | No | No | No | 1/2" blowdown |
| 403197490 | Form 17 | 10/13/2022 | 10/14/2022 | PLUNGER LIFT | 291 | NO FLOW | -- | 291 | NO FLOW | 291 | 291 | No | -- | -- | Per approval and guidance from the COGCC Area Engineer, a modified bradenhead test is being submitted to the COGCC due to pending remedial work on this well and safety concerns with performing a full bradenhead test at this time. TEP will perform a bradenhead test on the well after the proposed remedial work is complete and will submit the results to the COGCC via a Form 17. |
| Click for Specifics | Full | 7/27/2021 | 8/9/2021 | Plunger Lift | 0 | N/A | -- | 0 | No Flow | 370 | 370 | No | No | No | |