| Click for Specifics | Full | 7/28/2025 | 9/1/2025 | | 230 | N/A | -- | 0 | No Flow | 347 | 348 | No | No | No | 2" blowdown |
| Click for Specifics | Full | 9/4/2024 | 10/7/2024 | | 198 | N/A | -- | 0 | No Flow | 317 | 317 | No | No | No | 2" blowdown |
| Click for Specifics | Full | 3/13/2023 | 4/10/2023 | Plunger Lift | 201 | N/A | -- | 0 | No Flow | 389 | 389 | No | No | No | 1/2" blowdown |
| 403141929 | Form 17 | 8/17/2022 | 8/19/2022 | PLUNGER LIFT | 268 | NO FLOW | -- | 268 | NO FLOW | 268 | 268 | No | -- | -- | Per approval and guidance from the COGCC Area Engineer, a modified bradenhead test is being submitted to the COGCC due to pending remedial work on this well and safety concerns with performing a full bradenhead test at this time. TEP will perform a bradenhead test on the well after the proposed remedial work is complete and will submit the results to the COGCC via a Form 17. |
| Click for Specifics | Full | 9/16/2021 | 10/11/2021 | Plunger Lift | 0 | N/A | -- | 0 | No Flow | 280 | 280 | No | No | No | |