| 404398269 | Form 17 | 10/20/2025 | 10/21/2025 | FLOWING | 45 | CONTINUOUS | GAS | 0 | NO FLOW | 125 | 125 | Yes | Yes | -- | RESAMPLE OF THE BRADENHEAD GAS. POSSIBLE CONTAMINATION OF THE FIRST SAMPLE FROM THE FLOWLINE BACKFEEDING THROUGH THE CHECK VALVES.
|
| 404331283 | Form 17 | 8/22/2025 | 8/26/2025 | FLOWING | 100 | CONTINUOUS | GAS | 0 | NO FLOW | 120 | 120 | Yes | Yes | -- | 7 DAY BUILD UP. SURFACE CASING TIED INTO FLOWLINE. GAS SAMPLE TAKEN. SAMPLE ID: 05-103-09488
|
| Click for Specifics | Full | 7/7/2025 | 8/4/2025 | | 100 | Continuous | -- | 0 | No Flow | 123 | 123 | No | No | No | |
| Click for Specifics | Full | 7/17/2024 | 8/6/2024 | | 60 | Down to Zero | -- | 0 | No Flow | 140 | 140 | No | No | No | |
| Click for Specifics | Full | 7/21/2023 | 7/31/2023 | ESP | 100 | Continuous | -- | 0 | Down to Zero | 169 | 169 | No | No | No | |
| Click for Specifics | Full | 7/14/2022 | 8/9/2022 | Shut-In | 120 | Continuous | -- | 0 | No Flow | 114 | 114 | No | No | No | |
| 402756351 | Form 17 | 7/14/2021 | 7/22/2021 | PUMPING | 260 | CONTINUOUS | GAS | 110 | CONTINUOUS | 120 | 120 | No | -- | -- | WELL HAS APPROVED PRESSURE MANAGEMENT PLAN IN PLACE TO FLOW THE BRADENHEAD TO SALES. WE WILL CONTINUE TO FOLLOW THE APPROVAED PLAN TO MAINTAIN A PRESSURE BELOW THE PRESSURE LIMIT. |
| 402542519 | Form 17 | 11/24/2020 | 11/30/2020 | SHUT-IN | 250 | CONTINUOUS | GAS | 0 | DOWN TO 0 | 0 | 0 | Yes | Yes | -- | SAMPLE CYLINDER # 1067 |