| 404329651 | Form 17 | 8/22/2025 | 8/26/2025 | PUMPING | 75 | CONTINUOUS | GAS | 0 | NO FLOW | 180 | 180 | Yes | Yes | -- | 7 DAY BUILD UP. SURFACE CASING TIED INTO FLOWLINE. GAS SAMPLE TAKEN. SAMPLE ID: 05-103-07519
|
| Click for Specifics | Full | 10/8/2024 | 11/4/2024 | | 75 | Down to Zero | -- | 0 | No Flow | 123 | 123 | No | No | No | |
| Click for Specifics | Full | 10/17/2023 | 10/31/2023 | Pumping | 75 | Continuous | -- | 0 | Down to Zero | 110 | 110 | No | No | No | |
| Click for Specifics | Full | 10/25/2022 | 11/8/2022 | Pumping | 100 | Continuous | -- | 0 | No Flow | 110 | 110 | No | No | No | |
| Click for Specifics | Full | 10/25/2021 | 11/8/2021 | Pumping | 202 | Continuous | -- | 0 | Down to Zero | 101 | 101 | No | No | No | |
| 402733133 | Form 17 | 6/28/2021 | 6/29/2021 | PUMPING | 236 | CONTINUOUS | GAS | 1 | WHISPER | 79 | 79 | Yes | Yes | -- | Blew to a whisper in 2:16 |