Click for Specifics | Full | 7/9/2024 | 8/6/2024 | | 180 | Continuous | -- | 0 | Down to Zero | 0 | 0 | No | No | No | Observation well status. Plan to tie BH to flowline in place |
Click for Specifics | Full | 7/11/2023 | 7/31/2023 | Shut-In | 148 | Continuous | -- | 0 | No Flow | 0 | 0 | No | No | No | |
Click for Specifics | Full | 7/11/2022 | 8/9/2022 | Shut-In | 121 | Continuous | -- | 0 | No Flow | 0 | 0 | No | No | No | |
Click for Specifics | Full | 7/11/2021 | 8/9/2021 | Shut-In | 198.9 | Continuous | -- | 0 | Down to Zero | 137 | 137 | No | No | No | |