| 403100451 | Form 17 | 6/3/2022 | 7/10/2022 | INJECTION | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | -- | No | -- | -- | |
| 403030257 | Form 17 | 3/28/2022 | 4/27/2022 | INJECTION | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | -- | No | -- | -- | |
| 403248131 | Form 17 | 9/14/2021 | 12/2/2022 | | 0 | NO FLOW | -- | 0 | | 0 | -- | No | -- | -- | |
| 400744434 | Form 17 | 10/15/2015 | 12/16/2015 | PUMPING | 0 | WHISPER | -- | 0 | DOWN TO 0 | 105 | 105 | No | -- | -- | Dug up wellhead, connected 1st riser with 1" valve to surface for future test. A performed bradenhead test as reported.
|