| 404223900 | Form 17 | 5/27/2025 | 5/30/2025 | PLUNGER LIFT | 144 | CONTINUOUS | GAS | 0 | NO FLOW | 503 | 516 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403662503 | Form 17 | 1/22/2024 | 1/22/2024 | FLOWING | 396 | CONTINUOUS | GAS | 0 | WHISPER | 1607 | 1608 | No | -- | -- | The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 12/5/2023 | 12/11/2023 | Shut-In | 0 | N/A | -- | 0 | No Flow | 1866 | 1866 | No | No | No | 1/2" bh. SHUT-IN, NO TUBING. |