| 404192059 | Form 17 | 5/2/2025 | 5/6/2025 | PLUNGER LIFT | 294 | CONTINUOUS | GAS | 0 | WHISPER | 166 | 169 | No | -- | -- | This is an annual bradenhead test that was performed on day three of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| 403692868 | Form 17 | 2/20/2024 | 2/20/2024 | PLUNGER LIFT | 121 | CONTINUOUS | GAS | 0 | WHISPER | 198 | 182 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 2" valve. |
| 403347421 | Form 17 | 3/15/2023 | 3/16/2023 | PLUNGER LIFT | 309 | CONTINUOUS | GAS | 0 | NO FLOW | 202 | 186 | No | -- | -- | This is an annual bradenhead test that was performed on the third day of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2" valve. |
| Click for Specifics | Full | 10/19/2022 | 11/8/2022 | Plunger Lift | 125 | N/A | -- | 0 | Down to Zero | 198 | 193 | No | No | No | 1/2" Blowdown |
| Click for Specifics | Full | 10/6/2021 | 10/25/2021 | Plunger Lift | 500 | N/A | -- | 81 | Continuous | 222 | 222 | No | No | No | |
| 402694183 | Form 17 | 5/18/2021 | 5/19/2021 | PLUNGER LIFT | 508 | CONTINUOUS | GAS | 66 | CONTINUOUS | 256 | 263 | No | -- | -- | |