| 404152224 | Form 17 | 3/31/2025 | 4/3/2025 | CLOCK/INTERMITTER | 577 | CONTINUOUS | GAS | 0 | WHISPER | 455 | 598 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The bradenhead test was performed through a 2 inch valve and intermediate is plumbed with 2 inch blowdown. Well cycled during test. |
| 403750966 | Form 17 | 4/11/2024 | 4/11/2024 | CLOCK/INTERMITTER | 409 | CONTINUOUS | GAS | 0 | WHISPER | 114 | 117 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The bradenhead test was performed through a 1/2 inch valve and the intermediate test was performed through a 2 inch valve. |
| 403437749 | Form 17 | 6/19/2023 | 6/19/2023 | CLOCK/INTERMITTER | 273 | CONTINUOUS | GAS | 0 | NO FLOW | 451 | 393 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flowline with an approved pressure management plan. Both tests were performed through a 1/2" valve. |
| 403101050 | Form 17 | 6/22/2022 | 7/11/2022 | CLOCK/INTERMITTER | 625 | CONTINUOUS | GAS | 0 | NO FLOW | 210 | 146 | No | -- | -- | Per verbal approval from COGCC's Aaron Katz, the intermediate casing was not tested due to safety concerns associated with high pressure. The bradenhead test was performed through a 1/2" valve. |
| Click for Specifics | Full | 6/23/2021 | 7/12/2021 | Clock/Intermitter | 582 | N/A | -- | 0 | Whisper | 418 | 439 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 300 | | -- | -- | No | No | No | |