| 404185351 | Form 17 | 4/30/2025 | 4/30/2025 | PLUNGER LIFT | 180 | CONTINUOUS | GAS | 0 | NO FLOW | 138 | 143 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403665621 | Form 17 | 1/23/2024 | 1/24/2024 | PLUNGER LIFT | 106 | CONTINUOUS | GAS | 0 | NO FLOW | 135 | 127 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403331620 | Form 17 | 2/27/2023 | 2/27/2023 | PLUNGER LIFT | 373 | CONTINUOUS | GAS | 0 | NO FLOW | 130 | 142 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403045229 | Form 17 | 5/10/2022 | 5/11/2022 | PLUNGER LIFT | 427 | CONTINUOUS | GAS | 0 | NO FLOW | 146 | 138 | No | -- | -- | Test performed through a 1/2" valve. |
| Click for Specifics | Full | 2/3/2022 | 3/7/2022 | Plunger Lift | 372 | N/A | -- | 0 | No Flow | 142 | 144 | No | No | No | 1/2 valve |
| Click for Specifics | Full | 7/26/2021 | 8/9/2021 | Plunger Lift | 306 | N/A | -- | 0 | No Flow | 148 | 148 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 333 | | -- | -- | No | No | No | |