| 404185346 | Form 17 | 4/30/2025 | 4/30/2025 | PLUNGER LIFT | 108 | CONTINUOUS | GAS | 0 | NO FLOW | 129 | 135 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403665524 | Form 17 | 1/23/2024 | 1/24/2024 | PLUNGER LIFT | 130 | CONTINUOUS | GAS | 0 | NO FLOW | 132 | 132 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403331632 | Form 17 | 2/27/2023 | 2/27/2023 | PLUNGER LIFT | 294 | CONTINUOUS | GAS | 0 | NO FLOW | 122 | 132 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 10/19/2022 | 11/8/2022 | Plunger Lift | 247 | N/A | -- | 0 | No Flow | 131 | 122 | No | No | No | 1/2 valve |
| Click for Specifics | Full | 7/26/2021 | 8/9/2021 | Plunger Lift | 183 | N/A | -- | 0 | No Flow | 145 | 145 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 42 | | -- | -- | No | No | No | |