| 404179043 | Form 17 | 4/23/2025 | 4/25/2025 | PLUNGER LIFT | 199 | CONTINUOUS | GAS | 0 | DOWN TO 0 | 172 | 176 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403698569 | Form 17 | 2/23/2024 | 2/26/2024 | PLUNGER LIFT | 130 | DOWN TO 0 | GAS | 0 | WHISPER | 175 | 185 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403367046 | Form 17 | 4/5/2023 | 4/6/2023 | PLUNGER LIFT | 260 | CONTINUOUS | GAS | 0 | WHISPER | 198 | 201 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 2/9/2022 | 3/7/2022 | Plunger Lift | 317 | N/A | -- | 0 | Whisper | 181 | 181 | No | No | No | 1/2 valve. 7 day build up. |
| 402868462 | Form 17 | 11/11/2021 | 11/11/2021 | PLUNGER LIFT | 485 | CONTINUOUS | GAS | 0 | WHISPER | 184 | 193 | No | -- | -- | |
| Click for Specifics | Full | 9/29/2021 | 10/11/2021 | Gas Lift | 486 | N/A | -- | 0 | No Flow | 193 | 192 | No | No | No | SURFACE CASING BLEW DEAD IN ABOUT 12 MINUTES |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 250 | | -- | -- | No | No | No | |