Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-045-21931Bosely
SG 702-23-HN1
TEP ROCKY MOUNTAIN LLC
96850
PR
11/7/2013
GRAND VALLEY
31290
GARFIELD  045
SWSW 23 7S96W 6
334689
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1583 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404324679Form 178/15/20258/21/2025CLOCK/INTERMITTER512CONTINUOUS GAS0 NO FLOW 207225No----This is an annual bradenhead test that was performed on day one of the seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. TEP Rocky Mountain LLC has received ECMC approval to not test the intermediate casing due to safety concerns associated with the testing process.
403693855Form 172/21/20242/21/2024PLUNGER LIFT199CONTINUOUS GAS0 NO FLOW 213185No----This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. TEP Rocky Mountain LLC (TEP) has received ECMC approval to not test the intermediate casing annulus due to safety concerns associated with the testing process.
403361505Form 173/30/20233/31/2023PLUNGER LIFT575CONTINUOUS GAS0 NO FLOW 263269No----This is an annual bradenhead test that was performed on day three of a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. Both tests were performed through a 1/2" valve.
Click for SpecificsFull2/7/20223/7/2022Flowing286N/A--0No Flow230230NoNoNo1/2 valve. 7 day build up.
Click for SpecificsFull10/5/202110/25/2021Plunger Lift322N/A--0No Flow237237NoNoNo 
402694204Form 175/18/20215/19/2021PLUNGER LIFT322CONTINUOUS GAS0 NO FLOW 237251No---- 
Click for SpecificsLight10/1/20156/2/2020 --  0 ----NoNoNo