| 404224832 | Form 17 | 5/29/2025 | 6/2/2025 | PLUNGER LIFT | 0 | DOWN TO 0 | NONE | 0 | NO FLOW | 315 | 298 | No | -- | -- | This Form 17 submittal is associated with post-workover operations and a COA attached to ECMC Doc# 404035967. |
| 404020733 | Form 17 | 12/4/2024 | 12/9/2024 | PLUNGER LIFT | 375 | CONTINUOUS | GAS | 0 | NO FLOW | 375 | 368 | No | -- | -- | TEP has initiated an diagnostic evaluation of the well due to the bradenhead threshold pressure exceedance. The bradenhead test was performed through a two-inch valve. |
| Click for Specifics | Full | 5/20/2024 | 6/10/2024 | | 1 | N/A | -- | 0 | No Flow | 448 | 447 | No | No | No | 1/2 bh |
| Click for Specifics | Full | 2/20/2023 | 3/15/2023 | Plunger Lift | 0 | N/A | -- | 0 | No Flow | 308 | 308 | No | No | No | |
| Click for Specifics | Full | 3/17/2022 | 4/18/2022 | Plunger Lift | 0 | N/A | -- | 0 | No Flow | 161 | 160 | No | No | No | Blow down 1/2” |
| Click for Specifics | Full | 5/5/2021 | 6/7/2021 | Shut-In | 0 | N/A | -- | 0 | N/A | 166 | 166 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |