| 404534988 | Form 17 | 1/29/2026 | 2/5/2026 | PLUNGER LIFT | 154 | CONTINUOUS | GAS | 0 | WHISPER | 208 | 214 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. This well has an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 404359981 | Form 17 | 9/18/2025 | 9/18/2025 | PLUNGER LIFT | 160 | CONTINUOUS | GAS | 0 | WHISPER | 216 | 218 | No | -- | -- | |
| 404121193 | Form 17 | 3/3/2025 | 3/10/2025 | PLUNGER LIFT | 163 | CONTINUOUS | GAS | 0 | WHISPER | 203 | 205 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403704782 | Form 17 | 2/23/2024 | 3/1/2024 | PLUNGER LIFT | 251 | CONTINUOUS | GAS | 0 | WHISPER | 298 | 300 | No | -- | -- | The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 5/10/2023 | 6/12/2023 | Plunger Lift | 189 | N/A | -- | 0 | Whisper | 206 | 208 | No | No | No | 1/2" Blowdown |
| Click for Specifics | Full | 4/22/2022 | 5/16/2022 | Plunger Lift | 261 | N/A | -- | 0 | Down to Zero | 192 | 197 | No | No | No | 1/2" Blow Down |
| Click for Specifics | Full | 8/23/2021 | 9/6/2021 | Plunger Lift | 228 | N/A | -- | 0 | No Flow | 211 | 213 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |