| 404213433 | Form 17 | 5/20/2025 | 5/22/2025 | PLUNGER LIFT | 0 | CONTINUOUS | GAS | 0 | NO FLOW | 246 | 248 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403807534 | Form 17 | 5/29/2024 | 5/30/2024 | PLUNGER LIFT | 113 | CONTINUOUS | GAS | 0 | WHISPER | 321 | 321 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 6/21/2023 | 7/17/2023 | Plunger Lift | 45 | N/A | -- | 45 | N/A | 307 | 307 | No | No | No | tied into sales |
| 403156156 | Form 17 | 9/1/2022 | 9/6/2022 | PLUNGER LIFT | 154 | CONTINUOUS | GAS | 0 | NO FLOW | 258 | 263 | No | -- | -- | |
| Click for Specifics | Full | 3/14/2022 | 4/18/2022 | Plunger Lift | 153 | N/A | -- | 0 | No Flow | 208 | 223 | No | No | No | 2 inch ball valve |
| Click for Specifics | Full | 6/30/2021 | 7/12/2021 | Shut-In | 141 | N/A | -- | 0 | Down to Zero | 235 | 235 | No | No | No | |
| Click for Specifics | Light | 6/19/2019 | 6/2/2020 | | 39 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/9/2017 | 6/2/2020 | | 40 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/15/2016 | 6/2/2020 | | 39 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 11/14/2010 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 10/30/2010 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |