| 404256441 | Form 17 | 6/19/2025 | 6/25/2025 | PLUNGER LIFT | 128 | CONTINUOUS | GAS | 0 | NO FLOW | 276 | 278 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403799191 | Form 17 | 5/21/2024 | 5/21/2024 | PLUNGER LIFT | 131 | CONTINUOUS | GAS | 0 | WHISPER | 296 | 283 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 6/26/2023 | 7/17/2023 | Plunger Lift | 59 | N/A | -- | 59 | N/A | 271 | 273 | No | No | No | Tied In |
| Click for Specifics | Full | 4/11/2022 | 5/16/2022 | Plunger Lift | 73 | N/A | -- | 73 | N/A | 283 | 273 | No | No | No | tied into tubing |
| Click for Specifics | Full | 7/14/2021 | 8/9/2021 | Flowing | 77 | N/A | -- | 77 | Surge | 281 | 283 | No | No | No | Tied into flowline. |
| 402328291 | Form 17 | 2/28/2020 | 3/2/2020 | SHUT-IN | 151 | GAS | -- | 0 | DOWN TO 0 | 281 | 285 | No | -- | -- | Bradenhead left open and added to flow test list per Craig Burger. |
| Click for Specifics | Light | 6/19/2019 | 6/2/2020 | | 13 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/9/2017 | 6/2/2020 | | 30 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 30 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/11/2011 | 6/2/2020 | | 15 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/28/2011 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |