| 404256386 | Form 17 | 6/17/2025 | 6/25/2025 | PLUNGER LIFT | 149 | CONTINUOUS | GAS | 0 | NO FLOW | 211 | 218 | No | -- | -- | This is an annual bradenhead test that was performed on day one of the seven-day shut-in period before threshold pressure was reached for environmental and safety concerns. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403990580 | Form 17 | 11/8/2024 | 11/12/2024 | PLUNGER LIFT | 152 | CONTINUOUS | GAS | 0 | NO FLOW | 293 | 299 | No | -- | -- | TEP has initiated an diagnostic evaluation due to the threshold pressure exceedance. The test was performed through
a two-inch valve. |
| Click for Specifics | Full | 5/8/2024 | 6/10/2024 | | 114 | N/A | -- | 0 | No Flow | 304 | 308 | No | No | No | 2" Blowdown |
| Click for Specifics | Full | 6/26/2023 | 7/17/2023 | Plunger Lift | 113 | N/A | -- | 0 | No Flow | 319 | 318 | No | No | No | 2" Blowdown |
| Click for Specifics | Full | 4/11/2022 | 5/16/2022 | Plunger Lift | 138 | N/A | -- | 0 | No Flow | 298 | 304 | No | No | No | 2 inch ball valve |
| Click for Specifics | Full | 7/14/2021 | 8/9/2021 | Shut-In | 133 | N/A | -- | 0 | Whisper | 292 | 304 | No | No | No | |
| Click for Specifics | Light | 6/19/2019 | 6/2/2020 | | 12 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/9/2017 | 6/2/2020 | | 3 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/17/2011 | 6/2/2020 | | 5 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/1/2011 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |