| 404618741 | Form 17 | 4/13/2026 | 4/14/2026 | PLUNGER LIFT | 158 | CONTINUOUS | GAS | 0 | NO FLOW | 287 | 290 | No | -- | -- | TEP has initiated a diagnostic evaluation of this well due to the bradenhead threshold pressure exceedance. The test was performed through a two-inch valve. |
| Click for Specifics | Full | 6/12/2025 | 7/17/2025 | | 139 | N/A | -- | 0 | No Flow | 328 | 330 | No | No | No | 2" Blowdown |
| Click for Specifics | Full | 5/8/2024 | 6/10/2024 | | 114 | N/A | -- | 0 | No Flow | 313 | 318 | No | No | No | 2" Blowdown |
| Click for Specifics | Full | 6/26/2023 | 7/17/2023 | Plunger Lift | 117 | N/A | -- | 0 | No Flow | 371 | 356 | No | No | No | 2" Blowdown |
| Click for Specifics | Full | 4/11/2022 | 5/16/2022 | Plunger Lift | 88 | N/A | -- | 0 | No Flow | 278 | 276 | No | No | No | 2 inch ball valve |
| Click for Specifics | Full | 7/14/2021 | 8/9/2021 | Shut-In | 87 | N/A | -- | 0 | No Flow | 202 | 218 | No | No | No | |
| Click for Specifics | Light | 6/19/2019 | 6/2/2020 | | 33 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/9/2017 | 6/2/2020 | | 32 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/7/2011 | 6/2/2020 | | 15 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/22/2011 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |