| 404256491 | Form 17 | 6/19/2025 | 6/25/2025 | PLUNGER LIFT | 125 | CONTINUOUS | GAS | 0 | NO FLOW | 235 | 107 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| 403799196 | Form 17 | 5/21/2024 | 5/21/2024 | PLUNGER LIFT | 112 | CONTINUOUS | GAS | 0 | NO FLOW | 262 | 266 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 6/26/2023 | 7/17/2023 | Plunger Lift | 60 | N/A | -- | 60 | N/A | 270 | 271 | No | No | No | Tied In |
| Click for Specifics | Full | 4/11/2022 | 5/16/2022 | Plunger Lift | 72 | N/A | -- | 72 | N/A | 286 | 289 | No | No | No | tied into tubing |
| Click for Specifics | Full | 7/14/2021 | 8/9/2021 | Flowing | 69 | N/A | -- | 69 | Surge | 269 | 269 | No | No | No | Tied into flowline. |
| 402458691 | Form 17 | 8/3/2020 | 8/4/2020 | SHUT-IN | 153 | GAS | -- | 0 | | 263 | 268 | No | -- | -- | Bradenhead left open and added to flow test list per Craig Burger. |
| Click for Specifics | Light | 6/19/2019 | 6/2/2020 | | 16 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/9/2017 | 6/2/2020 | | 16 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 13 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/1/2011 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/17/2011 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |