| 404535025 | Form 17 | 1/29/2026 | 2/5/2026 | PLUNGER LIFT | 88 | CONTINUOUS | GAS | 0 | NO FLOW | 245 | 247 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. This well has an approved pressure management plan. The test was performed through a 2 inch valve. |
| 404209311 | Form 17 | 5/12/2025 | 5/19/2025 | PLUNGER LIFT | 91 | CONTINUOUS | GAS | 0 | NO FLOW | 242 | 230 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| 403878016 | Form 17 | 8/1/2024 | 8/6/2024 | PLUNGER LIFT | 92 | CONTINUOUS | GAS | 0 | NO FLOW | 277 | 279 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 10/9/2023 | 11/6/2023 | Plunger Lift | 33 | N/A | -- | 34 | N/A | 262 | 264 | No | No | No | Tied in |
| 403256608 | Form 17 | 12/9/2022 | 12/12/2022 | PLUNGER LIFT | 157 | CONTINUOUS | GAS | 0 | NO FLOW | 278 | 283 | No | -- | -- | Test performed through a 2" valve. |
| Click for Specifics | Full | 6/24/2022 | 7/6/2022 | Plunger Lift | 140 | N/A | -- | 0 | No Flow | 275 | 276 | No | No | No | |
| Click for Specifics | Full | 9/30/2021 | 10/11/2021 | Plunger Lift | 71 | N/A | -- | 0 | No Flow | 267 | 268 | No | No | No | |
| Click for Specifics | Light | 6/19/2019 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/9/2017 | 6/2/2020 | | 2 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/15/2016 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/18/2009 | 6/2/2020 | | 120 | | | 0 | | -- | -- | No | No | No | |