| 404075426 | Form 17 | 1/29/2025 | 1/30/2025 | CLOCK/INTERMITTER | 1 | CONTINUOUS | GAS | 0 | NO FLOW | 120 | 112 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. Well cycled during test. |
| 403861855 | Form 17 | 7/22/2024 | 7/22/2024 | CLOCK/INTERMITTER | 66 | CONTINUOUS | GAS | 0 | NO FLOW | 107 | 116 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 8/1/2023 | 9/11/2023 | Clock/Intermitter | 69 | N/A | -- | 69 | N/A | 90 | 82 | No | No | No | Tied in |
| 403048026 | Form 17 | 5/3/2022 | 5/12/2022 | CLOCK/INTERMITTER | 228 | CONTINUOUS | GAS | 0 | WHISPER | 106 | 117 | No | -- | -- | |
| 403006289 | Form 17 | 3/31/2022 | 4/6/2022 | CLOCK/INTERMITTER | 345 | CONTINUOUS | GAS | 30 | CONTINUOUS | 1070 | 1070 | No | -- | -- | Test performed through 1/2" valve |
| Click for Specifics | Full | 8/4/2021 | 9/6/2021 | Plunger Lift | 32 | N/A | -- | 0 | No Flow | 111 | 111 | No | No | No | |
| Click for Specifics | Light | 10/12/2018 | 6/2/2020 | | 3 | | | 3 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 9/19/2017 | 6/2/2020 | | 3 | | | 5 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 10/7/2016 | 6/2/2020 | | 2 | | | 2 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 12/24/2014 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | No Braiden head pressure |
| Click for Specifics | Light | 1/14/2012 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 1/22/2011 | 6/2/2020 | | 3 | | | 0 | | -- | -- | No | No | No | |