| 404074224 | Form 17 | 1/29/2025 | 1/30/2025 | PLUNGER LIFT | 111 | CONTINUOUS | GAS | 0 | NO FLOW | 258 | 267 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403861852 | Form 17 | 7/22/2024 | 7/22/2024 | PLUNGER LIFT | 98 | CONTINUOUS | GAS | 0 | NO FLOW | 267 | 233 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 8/1/2023 | 9/11/2023 | Plunger Lift | 83 | N/A | -- | 83 | N/A | 271 | 246 | No | No | No | Tied in |
| Click for Specifics | Full | 3/24/2022 | 4/18/2022 | Clock/Intermitter | 103 | N/A | -- | 103 | N/A | 247 | 247 | No | No | No | Tied in |
| 402781595 | Form 17 | 8/11/2021 | 8/16/2021 | PLUNGER LIFT | 176 | CONTINUOUS | GAS | 17 | CONTINUOUS | 316 | 322 | No | -- | -- | |
| Click for Specifics | Full | 8/4/2021 | 9/6/2021 | Plunger Lift | 132 | N/A | -- | 1 | Whisper | 261 | 261 | No | No | No | |
| Click for Specifics | Light | 10/12/2018 | 6/2/2020 | | 126 | | | 126 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 9/19/2017 | 6/2/2020 | | 117 | | | 120 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 10/7/2016 | 6/2/2020 | | 115 | | | 115 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 12/24/2014 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | No Braiden head pressure |
| Click for Specifics | Light | 1/14/2012 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 1/22/2011 | 6/2/2020 | | 2 | | | 0 | | -- | -- | No | No | No | |