| 404171868 | Form 17 | 4/17/2025 | 4/21/2025 | PLUNGER LIFT | 152 | CONTINUOUS | WATER H20 | 0 | SURGE | 245 | 247 | No | -- | -- | This is an annual bradenhead test that was performed on day six of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403780097 | Form 17 | 5/6/2024 | 5/7/2024 | PLUNGER LIFT | 151 | CONTINUOUS | WATER H20 | 0 | WHISPER | 247 | 252 | No | -- | -- | This is an annual bradenhead test that was performed on Day Four of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve.
|
| Click for Specifics | Full | 2/17/2023 | 3/15/2023 | Plunger Lift | 108 | N/A | -- | 108 | N/A | 333 | 336 | No | No | No | Tied into flowline |
| 403078291 | Form 17 | 6/13/2022 | 6/14/2022 | PLUNGER LIFT | 156 | CONTINUOUS | WATER H20 | 0 | WHISPER | 327 | 330 | No | -- | -- | |
| Click for Specifics | Full | 3/22/2022 | 4/18/2022 | Plunger Lift | 145 | N/A | -- | 145 | N/A | 327 | 333 | No | No | No | tied into tubing |
| Click for Specifics | Full | 6/30/2021 | 7/12/2021 | Plunger Lift | 99 | N/A | -- | 99 | N/A | 257 | 257 | No | No | No | Tied into Flowline |
| 402408111 | Form 17 | 5/28/2020 | 5/28/2020 | PLUNGER LIFT | 153 | GAS | -- | 0 | VAPOR | 253 | 261 | No | -- | -- | |
| Click for Specifics | Light | 6/19/2019 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/9/2017 | 6/2/2020 | | 55 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 49 | | | 3 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 8/5/2008 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/26/2007 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |