| 404209459 | Form 17 | 5/19/2025 | 5/19/2025 | PLUNGER LIFT | 134 | CONTINUOUS | GAS | 0 | NO FLOW | 181 | 170 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 1/2 inch valve. Well cycled during test. |
| 403658973 | Form 17 | 1/16/2024 | 1/18/2024 | PLUNGER LIFT | 133 | CONTINUOUS | GAS | 0 | NO FLOW | 159 | 159 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the flowline with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403383907 | Form 17 | 4/25/2023 | 4/25/2023 | PLUNGER LIFT | 212 | CONTINUOUS | WATER AND GAS | 0 | NO FLOW | 175 | 169 | No | -- | -- | The test was performed through a 2" valve. |
| Click for Specifics | Full | 3/15/2023 | 4/10/2023 | Plunger Lift | 179 | N/A | -- | 0 | No Flow | 148 | 157 | No | No | No | 2" valve |
| Click for Specifics | Full | 2/15/2022 | 3/7/2022 | Plunger Lift | 143 | N/A | -- | 0 | No Flow | 140 | 152 | No | No | No | 1/2 valve |
| Click for Specifics | Full | 8/20/2021 | 9/6/2021 | Plunger Lift | 125 | N/A | -- | 0 | No Flow | 142 | 142 | No | No | No | |
| 402291269 | Form 17 | 1/23/2020 | 1/30/2020 | PLUNGER LIFT | 90 | CONTINUOUS | -- | 15 | WATER H20 | 140 | 130 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 175 | | -- | -- | No | No | No | |