| 404226561 | Form 17 | 5/29/2025 | 6/3/2025 | PLUNGER LIFT | 87 | CONTINUOUS | GAS | 0 | NO FLOW | 253 | 259 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403790196 | Form 17 | 5/13/2024 | 5/14/2024 | CLOCK/INTERMITTER | 103 | CONTINUOUS | GAS | 0 | WHISPER | 234 | 236 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403309333 | Form 17 | 2/1/2023 | 2/1/2023 | PLUNGER LIFT | 152 | CONTINUOUS | GAS | 0 | NO FLOW | 239 | 243 | No | -- | -- | Test performed through a 2" valve. |
| Click for Specifics | Full | 3/16/2022 | 4/18/2022 | Clock/Intermitter | 123 | N/A | -- | 0 | No Flow | 266 | 267 | No | No | No | 2 inch ball valve |
| Click for Specifics | Full | 7/8/2021 | 8/9/2021 | Shut-In | 99 | N/A | -- | 0 | No Flow | 247 | 255 | No | No | No | |
| Click for Specifics | Light | 6/12/2019 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/13/2017 | 6/2/2020 | | 5 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/15/2016 | 6/2/2020 | | 9 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/17/2008 | 6/2/2020 | | 10 | | | 0 | | -- | -- | No | No | No | |