| 404070317 | Form 17 | 1/23/2025 | 1/27/2025 | PLUNGER LIFT | 169 | CONTINUOUS | GAS | 0 | WHISPER | 226 | 242 | No | -- | -- | This is an annual bradenhead test that was performed on day two of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403861859 | Form 17 | 7/22/2024 | 7/22/2024 | PLUNGER LIFT | 141 | CONTINUOUS | GAS | 0 | WHISPER | 261 | 236 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 8/1/2023 | 9/11/2023 | Plunger Lift | 84 | N/A | -- | 85 | N/A | 215 | 229 | No | No | No | Tied in |
| Click for Specifics | Full | 3/24/2022 | 4/18/2022 | Plunger Lift | 102 | N/A | -- | 102 | N/A | 372 | 372 | No | No | No | Tied in |
| 402824532 | Form 17 | 9/23/2021 | 9/28/2021 | PLUNGER LIFT | 154 | CONTINUOUS | GAS | 81 | CONTINUOUS | 369 | 383 | No | -- | -- | |
| Click for Specifics | Full | 8/4/2021 | 9/6/2021 | Plunger Lift | 148 | N/A | -- | 20 | Continuous | 472 | 472 | No | No | No | |
| Click for Specifics | Light | 10/12/2018 | 6/2/2020 | | 147 | | | 148 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 9/19/2017 | 6/2/2020 | | 141 | | | 143 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 10/7/2016 | 6/2/2020 | | 137 | | | 137 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 12/24/2014 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | No Braiden head pressure |
| Click for Specifics | Light | 1/14/2012 | 6/2/2020 | | 9 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 1/22/2011 | 6/2/2020 | | 5 | | | 0 | | -- | -- | No | No | No | |