403925592 | Form 17 | 9/17/2024 | 9/18/2024 | PLUNGER LIFT | 287 | CONTINUOUS | GAS | 0 | WHISPER | 224 | 226 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
403426911 | Form 17 | 6/7/2023 | 6/8/2023 | PLUNGER LIFT | 331 | CONTINUOUS | GAS | 0 | WHISPER | 209 | 214 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
Click for Specifics | Full | 3/31/2022 | 9/19/2022 | Plunger Lift | 327 | N/A | -- | 0 | No Flow | 210 | 202 | No | No | No | 1/2 valve tied in 7 day build up |
Click for Specifics | Full | 8/10/2021 | 9/6/2021 | Plunger Lift | 162 | N/A | -- | 170 | N/A | 211 | 230 | No | No | No | Braden head tied into flow line |
402291332 | Form 17 | 1/23/2020 | 1/29/2020 | PLUNGER LIFT | 313 | WHISPER | -- | 0 | WHISPER | 221 | 224 | No | -- | -- | |
Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 359 | | -- | -- | No | No | No | |