| 404213442 | Form 17 | 5/19/2025 | 5/22/2025 | CLOCK/INTERMITTER | 118 | CONTINUOUS | GAS | 0 | WHISPER | 49 | 49 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403868698 | Form 17 | 7/25/2024 | 7/29/2024 | CLOCK/INTERMITTER | 119 | CONTINUOUS | GAS | 0 | NO FLOW | 43 | 53 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 1/16/2023 | 2/7/2023 | Plunger Lift | 57 | N/A | -- | 57 | N/A | 413 | 414 | No | No | No | Surface casing is tied into tubing. |
| Click for Specifics | Full | 3/23/2022 | 4/18/2022 | Plunger Lift | 89 | N/A | -- | 89 | N/A | 235 | 235 | No | No | No | Tied in |
| Click for Specifics | Full | 6/9/2021 | 7/12/2021 | Plunger Lift | 75 | N/A | -- | 0 | No Flow | 270 | 270 | No | No | No | Tied into flow line |
| 402458688 | Form 17 | 8/3/2020 | 8/4/2020 | PLUNGER LIFT | 158 | GAS | -- | 0 | WHISPER | 259 | 267 | No | -- | -- | Bradenhead left open and added to flow test list per Craig Burger |
| Click for Specifics | Light | 6/12/2019 | 6/2/2020 | | 13 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/13/2017 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 23 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 12/1/2006 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |
| Click for Specifics | Light | 2/12/2006 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |