| 404228429 | Form 17 | 6/4/2025 | 6/4/2025 | PLUNGER LIFT | 160 | CONTINUOUS | GAS | 0 | NO FLOW | 172 | 171 | No | -- | -- | TEP has initiated a diagnostic evaluation due to the bradenhead threshold pressure exceedance. The test was performed through a two-inch valve. |
| Click for Specifics | Full | 1/24/2025 | 2/10/2025 | | 135 | N/A | -- | 0 | No Flow | 189 | 179 | No | No | No | 2" valve |
| Click for Specifics | Full | 5/28/2024 | 6/10/2024 | | 107 | N/A | Water and Gas | 0 | No Flow | 313 | 312 | No | No | No | 2" Blowdown 15 Gallons water |
| Click for Specifics | Full | 6/15/2023 | 7/17/2023 | Plunger Lift | 130 | N/A | -- | 0 | No Flow | 323 | 323 | No | No | No | 2" blowdown |
| Click for Specifics | Full | 3/11/2022 | 4/18/2022 | Plunger Lift | 93 | N/A | -- | 0 | No Flow | 115 | 115 | No | No | No | 2” blow down |
| Click for Specifics | Full | 6/30/2021 | 7/12/2021 | Shut-In | 84 | N/A | -- | 3 | Continuous | 137 | 147 | No | No | No | BH tied to tank by well head |
| Click for Specifics | Light | 6/12/2019 | 6/2/2020 | | 32 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/9/2017 | 6/2/2020 | | 24 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 76 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 7/25/2006 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/25/2001 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |