| 404241242 | Form 17 | 6/11/2025 | 6/16/2025 | PLUNGER LIFT | 137 | CONTINUOUS | GAS | 0 | WHISPER | 344 | 344 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403854682 | Form 17 | 7/15/2024 | 7/15/2024 | PLUNGER LIFT | 117 | CONTINUOUS | GAS | 0 | NO FLOW | 268 | 269 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 6/16/2023 | 7/17/2023 | Plunger Lift | 89 | N/A | -- | 89 | N/A | 261 | 262 | No | No | No | Tied in |
| Click for Specifics | Full | 2/17/2022 | 3/7/2022 | Plunger Lift | 109 | N/A | -- | 109 | N/A | 338 | 338 | No | No | No | tied in |
| Click for Specifics | Full | 6/29/2021 | 7/12/2021 | Flowing | 115 | N/A | -- | 115 | N/A | 332 | 332 | No | No | No | bradenhead is tied into tubing and selling. |
| 402501693 | Form 17 | 9/24/2020 | 10/1/2020 | FLOWING | 160 | GAS | -- | 0 | DOWN TO 0 | 330 | 330 | No | -- | -- | Bradenhead starting psi was 160 blown down thru a 1/2 needle valve |
| 402198467 | Form 17 | 9/30/2019 | 10/3/2019 | FLOWING | 174 | GAS | -- | 0 | WHISPER | 324 | 328 | No | -- | -- | Bradenhead initial pressure started at 174 blew down thru a ½ inch needle valve to 1 psi. |
| Click for Specifics | Light | 10/12/2018 | 6/2/2020 | | 174 | | | 0 | | -- | -- | No | No | No | |
| 401420213 | Form 17 | 9/21/2017 | 10/4/2017 | FLOWING | 171 | GAS | -- | 0 | WHISPER | 373 | 374 | No | -- | -- | BLEW DOWN BRADEN HEAD 30 MINUTES THREW A 1/2' NEEDLE VALVE, GOT TO A WHISPER |
| Click for Specifics | Light | 9/19/2017 | 6/2/2020 | | 171 | | Gas | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 10/7/2016 | 6/2/2020 | | 6 | | Gas | 6 | | -- | -- | Yes | Yes | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 2 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | 15 | | Gas | 0 | | -- | -- | Yes | Yes | No | |
| Click for Specifics | Light | 12/24/2014 | 6/2/2020 | | 15 | | Gas | 0 | | -- | -- | Yes | Yes | No | blead down braiden head thru needle valve, took approx 5 minutes |
| Click for Specifics | Light | 1/22/2011 | 6/2/2020 | | 2 | | | 0 | | -- | -- | No | No | No | |