| 404171881 | Form 17 | 4/21/2025 | 4/21/2025 | PLUNGER LIFT | 338 | CONTINUOUS | GAS | 0 | WHISPER | 159 | 150 | No | -- | -- | This is an annual bradenhead test that was performed on day five of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| 403695470 | Form 17 | 2/20/2024 | 2/22/2024 | PLUNGER LIFT | 217 | CONTINUOUS | GAS | 0 | WHISPER | 182 | 183 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 2" valve. |
| 403362067 | Form 17 | 3/30/2023 | 3/31/2023 | PLUNGER LIFT | 365 | CONTINUOUS | GAS | 12 | CONTINUOUS | 162 | 170 | No | -- | -- | This is an annual bradenhead test that was performed after one day of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403045183 | Form 17 | 5/10/2022 | 5/11/2022 | PLUNGER LIFT | 442 | CONTINUOUS | GAS | 0 | DOWN TO 0 | 145 | 152 | No | -- | -- | Test performed through a 1/2" valve. |
| Click for Specifics | Full | 2/14/2022 | 3/7/2022 | Plunger Lift | 482 | N/A | -- | 15 | Continuous | 163 | 156 | No | No | No | 1/2 valve |
| Click for Specifics | Full | 9/30/2021 | 10/11/2021 | Gas Lift | 72 | N/A | -- | 0 | No Flow | 164 | 164 | No | No | No | SURFACE CASING BLEW DEAD IN ABOUT 4 MINUTES |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 70 | | -- | -- | No | No | No | |