| Click for Specifics | Full | 1/28/2026 | 2/9/2026 | | 142 | N/A | -- | 0 | No Flow | 179 | 183 | No | No | No | 2 Inch Blowdown |
| 404391418 | Form 17 | 10/14/2025 | 10/14/2025 | PLUNGER LIFT | 156 | CONTINUOUS | GAS | 0 | NO FLOW | 194 | 185 | No | -- | -- | TEP has initiated a diagnostic evaluation due to the bradenhead threshold pressure exceedance. The bradenhead test was performed through a two-inch valve and the well did cycle during the test. |
| Click for Specifics | Full | 2/27/2025 | 3/11/2025 | | 134 | N/A | -- | 0 | No Flow | 202 | 205 | No | No | No | 2" valve |
| Click for Specifics | Full | 6/19/2024 | 7/9/2024 | | 136 | N/A | -- | 0 | No Flow | 206 | 210 | No | No | No | 2in Blowdown |
| 403588698 | Form 17 | 11/6/2023 | 11/8/2023 | PLUNGER LIFT | 152 | CONTINUOUS | GAS | 0 | NO FLOW | 223 | 219 | No | -- | -- | The test was performed through a 2" valve. |
| Click for Specifics | Full | 6/16/2023 | 7/17/2023 | Plunger Lift | 149 | N/A | -- | 0 | No Flow | 235 | 232 | No | No | No | 2" Blowdown |
| 403190159 | Form 17 | 10/4/2022 | 10/6/2022 | PLUNGER LIFT | 156 | CONTINUOUS | GAS | 0 | NO FLOW | 214 | 218 | No | -- | -- | Test was performed through a 2" valve. |
| Click for Specifics | Full | 2/16/2022 | 3/7/2022 | Plunger Lift | 128 | N/A | -- | 0 | No Flow | 172 | 172 | No | No | No | 2" blow down |
| Click for Specifics | Full | 6/30/2021 | 7/12/2021 | Flowing | 73 | N/A | -- | 73 | No Flow | 190 | 195 | No | No | No | |
| Click for Specifics | Light | 6/19/2019 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/13/2017 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/17/2012 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |
| Click for Specifics | Light | 12/4/2005 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |