| 404219789 | Form 17 | 5/28/2025 | 5/28/2025 | PLUNGER LIFT | 0 | DOWN TO 0 | NONE | 0 | NO FLOW | 387 | 387 | No | -- | -- | This Form 17 submittal is associated with post-workover operations and a COA attached to ECMC Doc# 404051264. |
| 404017985 | Form 17 | 12/5/2024 | 12/6/2024 | PLUNGER LIFT | 156 | CONTINUOUS | GAS | 114 | CONTINUOUS | 156 | -- | No | -- | -- | The bradenhead test was ended after after two minutes due to the production casing pressure trending with the surface
casing pressure and potential safety concerns. TEP has initiated an diagnostic evaluation due to the threshold
pressure exceedance and the test results. |
| Click for Specifics | Full | 5/3/2024 | 6/10/2024 | | 61 | N/A | -- | 0 | No Flow | 155 | 166 | No | No | No | 2 valve |
| Click for Specifics | Full | 1/12/2023 | 2/7/2023 | Plunger Lift | 39 | N/A | -- | 0 | No Flow | 215 | 220 | No | No | No | 2" blowdown |
| Click for Specifics | Full | 2/17/2022 | 3/7/2022 | Plunger Lift | 26 | N/A | -- | 0 | No Flow | 180 | 180 | No | No | No | 2" blow down |
| Click for Specifics | Full | 6/23/2021 | 7/12/2021 | Shut-In | 21 | N/A | -- | 0 | No Flow | 243 | 250 | No | No | No | |
| Click for Specifics | Light | 6/12/2019 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/9/2017 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/15/2016 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 9/21/2008 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |