| 404545667 | Form 17 | 2/4/2026 | 2/13/2026 | PLUNGER LIFT | 66 | CONTINUOUS | GAS | 0 | NO FLOW | 196 | 191 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. This well has an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| 404140476 | Form 17 | 3/24/2025 | 3/25/2025 | PLUNGER LIFT | 82 | CONTINUOUS | GAS | 0 | WHISPER | 216 | 216 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403872377 | Form 17 | 7/29/2024 | 7/31/2024 | PLUNGER LIFT | 82 | CONTINUOUS | GAS | 0 | NO FLOW | 204 | 205 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 3/23/2023 | 4/10/2023 | Plunger Lift | 64 | N/A | -- | 64 | N/A | 235 | 234 | No | No | No | 2" tied to flowline |
| Click for Specifics | Full | 3/15/2022 | 4/18/2022 | Plunger Lift | 62 | N/A | -- | 62 | N/A | 227 | 227 | No | No | No | 2” blow down |
| Click for Specifics | Full | 9/28/2021 | 10/11/2021 | Plunger Lift | 65 | N/A | -- | 25 | Continuous | 240 | 242 | No | No | No | |
| Click for Specifics | Light | 6/12/2019 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/13/2017 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 1 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 2/1/2006 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |